Skip to main content

This is a new service – your feedback will help us to improve it.

Brighton and Hove City Council

Brownfield land

There is a problem

  • 210 entries must have valid coordinates

SHLAA0004

OrganisationURI
SiteReference
SHLAA0004
SiteNameAddress
Land at Brighton Marina (Outer Harbour)
GeoX
POINT(-0.105988 50.810874)
GeoY
POINT(-0.105988 50.810874)
SiteplanURL
https://new.brighton-hove.gov.uk/sites/default/files/planning_bc_regen/policy/brownfield-sites/shlaa0004-land-at-brighton-marina-outer-harbour.pdf
Hectares
5.33
OwnershipStatus
not-owned-by-a-public-authority
PlanningStatus
permissioned
PermissionType
full-planning-permission
PermissionDate
2006-07-04
PlanningHistory
https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PPA1IFDM0PA00|https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZR61DMXE980|https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZR67DMXE520|https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZR6EDMXE556|https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZR73DMXE858|https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=ZZZR79DMXE336
Deliverable
yes
NetDwellingsRangeFrom
661
NetDwellingsRangeTo
661
HazardousSubstances
Notes
Phase 1 complete 201516 (195) Phase 2 (244) Commenced 2016/17. Brighton Marina Inner Harbour is a Strategic Allocation within the DA2 Development Area within CPP1. Call for Sites 2017. Public exhibition for proposed remaining sites Nov 2018. New application for 480 units phase 2 refused and appeal dismissed 2021
FirstAddedDate
2017-09-18
LastUpdatedDate
2022-12-05
EndDate
GeoX,GeoY

Geometry must use WGS84, OSGB or Mercator coordinates

How to improve Brighton and Hove City Council’s data

  1. Fix the errors indicated
  2. Use the check service to make sure the data meets the standard
  3. Publish the updated data on the endpoint URL